Friday, May 15, 2009

Week 3 comes to an end.

As week three of construction draws to a close, I must admit, I am surprised with the progress. We are ahead of schedule! I am very impressed with the contractor we elected to use as everyday items are being completed with efficiency. We already have all the walls in place, all the sheetrock in place and all the doors cut in. The oxygen, anesthesia scavenger and central vacuum lines have all been placed. Painting should begin early next week :) Other items that should take place next week include installation of cabinetry, wet and dry tables, and maybe even floors!

The contractor says that we should be in business by the beginning of June - I'd love to be treating patients and meeting owners by June especially since I was told the build out could take 70 days!

Have a great weekend everyone!

Thursday, May 14, 2009

Build out - Day 20

Hey Everyone! It's been a while since I've blogged...I do apologize. I am a first time blogger.

Things are going well at the buildout site. To those of you that frequent Wag-a-lot, thank you for your patience. We broke through the walls today and put in the doors. Things are really on schedule.

I plan on checking back daily now that I know how to do this blogging thing. Stay tuned for pictures

Saturday, May 2, 2009

Welcome!!

Welcome to my Petwell Veterinary Healthcare blog!! I will be sharing lots of info on the practice and posting updates on how the construction is proceeding in the coming weeks. We will be making out first appearance on TV today on "Movie and a Makeover" which airs during the movie "Must Love Dogs' on TBS. So set your DVR's!! Also, take a peak at http://www.tbs.com/stories/story/0,,173689,00.html for great tips and trends for your pet.